NPT end Strainer is an indispensable device in the transmission medium pipeline. It is usually installed at the inlet end of pressure reducing valve, relief valve .
Email-us info@tawajodindustrial.jo
NPT end Strainer is an indispensable device in the transmission medium pipeline. It is usually installed at the inlet end of pressure reducing valve, relief valve, constant water level valve or other equipment to eliminate impurities in the medium to protect the normal use of valves and equipment. When the fluid enters the filter cartridge with a certain size of filter screen, the impurities are blocked, and the clean filtrate is discharged from the filter outlet. When it needs to be cleaned, only the removable filter cartridge is removed, then re-loaded after treatment. Therefore, the use and maintenance is extremely convenient.
Y-type strainer is an indispensable strainer device in pipeline system for conveying medium. Y-type strainer is usually installed at the inlet of pressure relief valve, pressure relief valve, constant water level valve or other equipment to remove impurities in medium to protect the normal use of valves and equipment. Y-type strainer has the advantages of advanced structure, small resistance and convenient sewage discharge.
Applicable medium
1. Weak corrosive materials such as water, ammonia, oil and hydrocarbons in chemical industry, petroleum production and urban heat supply.
2. Corrosive materials such as soda ash, sulfuric acid, nitric acid, acetic acid, etc.
3. Low temperature materials such as liquid methane, liquid nitrogen, liquid oxygen and various refrigerant in refrigeration and air separation production.
4. Materials in light industry food and pharmaceutical production, such as beer, beverages, medical supplies, etc.
Body material: carbon steel, stainless steel, alloy steel
Nominal diameter:1/2”~24”
End Connection: NPT
Pressure range: Class150 – 300
Brand | 3D |
Valve Type | NPT End Strainer |
Valve Material | Cast steel, stainless steel, special alloy, etc |
Valve Test | 100% quantity tested before delivery |
Valve Guarantee | 18 months from the date of dispatch ex works, or 12 months from date of commodity installation. |
Valve Painting | Customer request |
Valve Package | Wooden case |
MOQ | No requirement |
Valve Certificate | API 6D/CE/ISO9001/ISO14001 |
Delivery Detail | Shipped in 4 or 6 weeks after payment |
Port | SHANGHAI |
Payment Terms | L/C,D/A,D/P,T/T |
Certificate Offered | Packing List,Commercial Invoice,Test Reports and Material Certificates,Certificate of quality and quantity, Seller’s Certificate of Guarantee |